Spanish Fork, Utah | Harris Architecture
Project Overview
• 25,000 square feet
• 1 level
• Wood framed Mezzanine
• Concrete slab-on-grade foundation
• Pre-engineered steel building
Services Provided
• Engineering calculations for structural components on Mezzanine and steel building foundation
• Footing/foundation plan.